Using the S8TS to Improve Reliability of the Backup Operation Circuit

Problems: Currently using two Power Supplies for backup operations, but the circuit configuration is complex and recovery after a malfunction is time-consuming and complicated. Change to S8TS Switching Power Supply, which provides a simple backup operation to replace conventional power supply systems. Use a system that can be constructed without specialized knowledge.